Increase channel-floodplain connectivity; arrest channel incision
BDAs and PALS using locally sourced woody material. Untreated wooden posts were used in most structures to increase their temporary stability. An additional 27 structures were built in Summer 2021 adding another 500 m of treated stream.
Cover Photo