Moose River Strategic Wood Addition


Vermont


Moose River branches and tributaries


Connecticut River


Link


Sep. 30, 2021


11265


436


Project Goals and Objectives

Improve brook trout habitat and stream function by providing cover, retaining organic material and fine sediment, creating pools, narrowing the low-flow channel, and improving floodplain access.

Structure Construction Elements

We call our technique strategic wood addition. On small streams where bankfull width is two times the average tree height, our methods are similar to chop-and-drop. On larger streams, we use a grip hoist to position downed trees in secure configurations. Most work was completed in 2021, but some remains to be done in 2022.

All Photos
Project on Moose River branches and tributaries
Project on Moose River branches and tributaries
Project Location