Cove Creek

Idaho


Cove Creek


Big Wood River


May. 18, 2023


1115


40


Project Goals and Objectives

The restoration goals are to increase stream complexity, improve riparian condition and increase extent, increase floodplain connectivity, and force ponding for fish habitat and in some instances create deep water habitat for beaver.

Structure Construction Elements

All structures were BDAs built by using local materials. Woody materials included mostly willow, aspen, and sagebrush, and soil was sourced from stream banks and hillslopes. Some structures were built using dead material where live material was scarce. Structures were reinforced using untreated wooden posts.

Project Photos
Photo of Cove Creek

Cover Photo

Project Location