The restoration goals were to increase floodplain connectivity, encourage widening in areas with incised channels, and arrest small headcuts to reduce further incision.
The structures built consisted of mostly BDAs, with some channel spanning and bank attatched PALS, as well as headcut arrests. Woody material consisted of mostly lodgepole pine harvested from a recent blowdown event in a forest stand onsite. Other materials included sagebrush and soil/sod material harvested from streambanks and hillslopes.
Cover Photo
(no date)
(no description)
(no date)
(no description)
(no date)
(no description)
(no date)
(no description)
(no date)
(no description)