Succor Creek Phase 2

Anabranch Solutions Design and Implementation

Idaho


Succor Creek


Succor Creek


Aug. 24, 2023


1628


36


Project Goals and Objectives

The restoration goals are to increase deposition and force ponding to create deepwater habitat for beaver expansion.

Structure Construction Elements

Maintenance was done on previously built structures: bulking up the density of material and adding height to the structures, especially where deposition had taken place from the previous year. Additional structures were also built, increasing the density of structures on the site as well. The majority of the structures were essentially dense PALS, using mostly coyote willow for material. Structures were reinforced with untreated posts.