Thompson Creek Phase 2

Anabranch Solutions Design and Implementation

Idaho


Thompson Creek


Little Wood River


Sep. 21, 2023


3190


53


Project Goals and Objectives

Restoration goals are to induce widening in an incised channel, force ponding for fish habitat, and to increase deposition post fire. Some headcuts were also arrested with the goal of reducing further incision.

Structure Construction Elements

A mix of BDAs and PALS were constructed using local materials within the riparian area. This included willow and fire deadened cottonwood and aspen, as well as sod material taken from the streambanks for BDAs. Several headcut arrests were also built using both willow and deadened logs. Maintenance was also performed on previously built structures, often extending bank attached PALS to become channel spanning PALS.

Project Photos
Photo of Thompson Creek Phase 2

Cover Photo

(no date)

(no description)

(no date)

(no description)

(no date)

(no description)

(no date)

(no description)

(no date)

(no description)

Project Location