Rito Penas Negras

New Mexico


Rito Penas Negras


Rito Penas Negras


Link ↗


May. 31, 2023


11265


600


Project Goals and Objectives

Install instream structures to raise the water table, catch sediment, alter the stream grade, and induce meandering and habitat complexity; to plant native vegetation; to install or repairing existing exclosures; and to conduct project monitoring.

Structure Construction Elements

450 beaver dam analogs and 150 large woody debris structures, exclosure fencing, 20,000 willows planted.

Project Photos
Photo of Rito Penas Negras

Cover Photo

Project Location