Canyon Creek

California


Canyon Creek


Canyon Creek HUC10


Link ↗


Aug. 31, 2023


137


4


Project Goals and Objectives

Private Property, do not visit without permission. Attract and maintain existing beaver populations downstream. Re-connect existing high flow channels. Encourage establishment of willow and aspen. Floodplain connectivity.

Structure Construction Elements

Private Property, do not visit without permission. 50+ structure locations have been identified. The first round of implementation (4 BDAs) occurred in fall 2023. Funding is being pursued for the rest of the design. Posted BDAs due to expected flows. Large tree used to anchor one of the structures.

Project Photos
Photo of Canyon Creek

Cover Photo

2023-11-02

Ponded water behind one of the BDAs

Project Location