Swain Meadow

California


Robbers Creek


Hamilton Branch


Link ↗


Oct. 11, 2022


625


17


Project Goals and Objectives

Connect floodplain. Attract beaver to adopt structures. Encourage establishment of willows to improve willow flycatcher habitat.

Structure Construction Elements

17 beaver dam analogs were constructed with the help of Chester elementary and high school students. Mostly single post line BDAs, occasionally adding extra posts in the thal-weg. Willow and conifer harvested on site.

Project Photos
Photo of Swain Meadow

Cover Photo

2022-10-13

Elementary students assist with BDA construction

2022-10-13

Students building BDA

Project Location