Hulsman Ranch- Louise Meadow

Symbiotic Restoration Design and construction

California


Un-named


Lower Susan River


Link ↗


Nov. 06, 2020


250


16


Project Goals and Objectives

*Private Property* Capture post fire sediments. Connect floodplain. Expand willow habitat.

Structure Construction Elements

*Private Property* Tightly packed BDAs using on-site willows and conifers. Implemented post fire, our structures captured an incredible amount of sediment during an atmospheric river event. They filled to the top in one event! All of the willows that we incorporated into the structures are growing so well! Phase two of the design will be implemented during the 2024 season.

Project Photos
Photo of Hulsman Ranch- Louise Meadow

Cover Photo

2021-11-08

Post fire sediments fill BDA to the top!

2023-04-22

Willow growth and sediment behind structure

2023-05-17

Willow growth in BDA

Project Location