Enhance riparian areas in Priority sage grouse habitat, water/sediment retention, development of inset floodplain in incised reaches.
28 Beaver Dam Analogs and 2 Post Assisted Log Structures. Up to 50 additional structures planned for Fall 2024.
Cover Photo