The goal of this project is to reconnect Fox Creek with its floodplain.
Structures were placed strategically throughout the project reach in areas that would maximize floodplain activation during high-flows. BDA's within this project consisted of 10-30 six-inch posts driven into to streambed. Willow and juniper slash from the wood structures placed throughout the project site were used to weave/fill between posts.
Cover Photo