This was the second phase of maintenance on 22 pre-existing structures. The goal of this maintenance was to reinforce structures that were beginning to deteriorate in order to continue increasing floodplain connectivity, creating sinuosity, and arresting incision.
Four PALS and 18 BDAs were maintained
Cover Photo