The goals of this project were to implement restoration actions using beaver dam analogs (BDAs) to improve baseflows and groundwater storage, floodplain connectivity, and critical habitat for ESA-listed steelhead.
Design included 10 postless BDAs constructed from locally sourced riparian vegetation (false indigo).
Cover Photo