Bring back the beaver! Site has been selected for re-introduction. Utilize Lt-PBR structures to help connect floodplain, hydrate willows, reinforce existing grade control weirs so they continue to function. 2024-2026 implementation.
Reinforced existing weirs with on-site materials. Constructed a mix of posted BDAs and PALS. Some utilizing large 4" posts in the main channel.
Cover Photo
2024-11-06
PALS
2024-10-22
BDA