Implemented 2021-2024. Plumas Corp is the design lead and project manager. Hybrid project- Plumas also implemented rock riffles using equipment. Symbiotic implemented 70+ Lt-PBR structures in-between the rock riffles and up and downstream of the riffles. Goals: capture post fire sediments, improve channel complexity, floodplain connectivity.
A mix of posted BDAs, PALS, and post-less BDAs.
Cover Photo